Melbourne · South East & Inner East
Renovation pricing,
out in the open.
Every other builder says “contact us for a quote.” We publish what things cost, so you can work out if your renovation is possible before you spend an evening on the phone.
No contact details needed to see a number. Reply within 2 business hours if you want a quote.
What people actually pay
- Bathroom Renovation Full Renovation $21k–$36k
- Kitchen Renovation Full Renovation $30k–$50k
- Wall Removal & Open Plan Load-Bearing $6,000–$12k
- Heritage Home Renovation Period Kitchen & Bath $55k–$110k
- Whole-Home Renovation Full Interior $150k–$280k
Indicative ranges for the most commonly chosen package. Your fixed price is confirmed after a free site visit.
What we do
Five things, done properly
We used to do handyman work, gardening and cleaning too. Now it's renovation only — because doing one thing well beats doing nine things adequately.
Bathroom Renovation
The common one. Everything out, layout improved, done properly.
Kitchen Renovation
New kitchen, better layout, same four walls.
Wall Removal & Open Plan
The wall carries load. Engineer, permit, steel beam, done right.
Heritage Home Renovation
Modern function behind a facade that still reads as original.
Whole-Home Renovation
New kitchen, new bathrooms, better layout. The house you wanted.
Not sure which?
Answer a few questions and we'll price the thing you're actually describing.
Start the estimatorHow it works
Four steps, no mystery
- 01
Get a number in 60 seconds
A few quick questions, no details required. You see a real range before you give us anything.
- 02
Free site visit
Kusal comes out, measures, checks what's behind the walls, and tells you what we'd actually do.
- 03
Fixed price in writing
Itemised, with inclusions and exclusions listed. Within three business days of the visit.
- 04
We build it
One named contact, photo updates at every stage, and certificates for everything that needs them.
Reviews
4.7★ from 18 ratings
“Kusal was amazing. He did a fantastic job and provided great advice during the process.”
“Prompt reply. Easy to deal with. Highly recommend.”
“Great service, friendly, very happy with the final job.”
“Reliable, hardworking, took the time to do the job properly. Thank you Kusal”
Common questions
The things people ask first
Your prices are published — is that a real quote?
No, and we won’t pretend otherwise. The published ranges are honest brackets built from 2026 Melbourne market pricing and our own completed jobs. They exist so you can work out whether a project is remotely in reach before spending an evening on phone calls.
Your fixed price comes after a free site visit, in writing, itemised, with inclusions and exclusions listed. That’s the number we’re bound to.
What we won’t do is quote low to win the job and recover it through variations. If the site visit reveals your project sits above the published range, we’ll tell you why, with the specific reason.
What insurance should my builder have in Victoria?
Two things matter.
Domestic building insurance (now Home Warranty for new eligible contracts signed from 1 July 2026) is required for domestic building work over $16,000 in Victoria. It protects you if the builder dies, disappears or becomes insolvent before the work is finished, and it covers defects for a period after completion. You should receive a certificate before you pay a deposit.
Public liability insurance covers damage to your property or injury on site during the work. Every builder should carry it; ask for the certificate of currency.
Ask for both in writing before signing anything. A builder who hesitates is telling you something.
How much deposit can a builder legally ask for in Victoria?
Under the Domestic Building Contracts Act 1995, the maximum deposit is:
- 10% of the contract price if the contract is under $20,000
- 5% of the contract price if the contract is $20,000 or more
Demanding more than that is an offence. If a builder does, you may avoid the contract at any time before it’s completed.
The limit exists so that if a builder fails mid-project, your exposure is capped. Anyone asking for 30% up front to “order materials” is asking you to carry their cash flow risk, and you should walk away.
How do you handle variations and cost blowouts?
Every variation is quoted in writing and approved by you before the work happens. No exceptions, no verbal agreements, no “we’ll sort it at the end.”
Variations come from three places: you change your mind, we find something hidden (rot, failed waterproofing, non-compliant old wiring), or a regulatory requirement emerges. The first is yours, the second we carry a stated contingency for, and the third we flag as soon as we know.
The dishonest version of this industry quotes low, wins the job, then recovers margin through variations once you’re committed and the house is half demolished. The defence is a detailed scope document — which is why ours lists exclusions as explicitly as inclusions.
How quickly will I hear back?
Within 2 business hours of your enquiry, from Kusal directly — not a call centre and not an automated sequence.
The site visit is usually within a week, and the written fixed-price quote lands within three business days of that visit.
If you use the estimator, your answers come through with the enquiry, which means the first conversation starts from the detail rather than from scratch.
Find out what yours costs
A few quick questions. No contact details until you want a real quote.