Renovate, or buy something else?
It’s a fair question and we’d rather you asked it before you spend $200,000 with us than after.
Renovating tends to win when the location is right, the bones are sound, and the layout is the problem. It tends to lose when the house has fundamental structural issues, when you’d be rebuilding more than half of it, or when the finished value would sit well above the ceiling for your street.
We’ll tell you which one you’re looking at during the site visit. Talking someone out of a job occasionally is cheaper for us than a project that nobody enjoys.
How the money is staged
Progress payments tied to completed stages, not to the calendar. You pay a deposit, then at defined milestones — demolition and structural complete, lock-up, services complete, practical completion — with a final payment held until the defects list is closed.
For any domestic building work over $16,000 in Victoria, the builder must carry the relevant domestic building insurance, and your contract must be a compliant major domestic building contract. That’s your protection if something goes wrong, and it is not a formality to be waived because it makes the paperwork easier.
The order things happen
Design and documentation first, then permits, then trades in sequence: demolition, structural, rough-in services, plaster, fit-off, finishes, defects. The sequencing sounds obvious and is where most badly-run renovations fall apart, because a trade that arrives before the one in front of it has finished either waits or does it twice.
A full interior runs 16 to 26 weeks on site. Renovate-and-extend runs 32 to 52, plus the planning permit time before it. Those numbers assume decisions are made when we need them — we give you a selections schedule with dates at the start so nothing surprises you.
Living arrangements
Most clients move out for a full interior renovation. It’s faster for us and far less miserable for you, and the time saved often offsets a meaningful share of the rent. Cosmetic projects can usually be staged so you stay in place, working through the house in sections.