Skip to content
UGreen Solutions

Bathroom renovations, priced before you call

Three packages, real numbers, and a fixed price in writing after one site visit. Most Melbourne bathrooms land between $21k and $36k — here's exactly what sits behind that.

  • Waterproofed to AS 3740 with certificates you keep
  • Licensed plumbers and electricians in-house
  • Fixed price in writing before demolition starts

Price at a glance

  • Refresh 2–3 weeks $12k–$18k
  • Full Renovation 3–5 weeks $21k–$36k
  • Premium 5–7 weeks $37k–$58k

Indicative ranges. Your fixed price is confirmed in writing after a free site visit.

4.7★
from 18 ratings
23
jobs booked through hipages
Licensed
plumbers & electricians
2 business hours
typical reply time

Packages

Three ways to do it

Every package below includes labour, materials, waterproofing, rubbish removal and the final clean. Tile allowances are stated per package — go over the allowance and you pay only the difference, itemised.

Refresh

Layout stays put. New surfaces, new fixtures, same footprint.

$12k–$18k
Indicative — fixed after site visit

2–3 weeks on site

Included

  • Strip out to studs where needed
  • New waterproofing to AS 3740
  • Floor and wall tiling (tile allowance $45/m²)
  • New vanity, toilet, tapware and shower screen
  • Repaint ceiling and any untiled walls
  • Exhaust fan replacement
  • All rubbish removal and final clean

Not included

  • Moving plumbing or drainage points
  • Structural changes or wall removal
  • Underfloor heating
Get a fixed price for the Bathroom Renovation Refresh package
Most chosen

Full Renovation

The common one. Everything out, layout improved, done properly.

$21k–$36k
Indicative — fixed after site visit

3–5 weeks on site

Included

  • Everything in Refresh
  • Layout changes and relocated fixtures
  • New plumbing and electrical rough-in by licensed trades
  • Floor levelling and new substrate
  • Full-height tiling (tile allowance $70/m²)
  • Custom shower niche and frameless screen
  • LED lighting and heated towel rail
  • Design consultation and 3D layout

Not included

  • Moving the bathroom to a different room
  • Structural steel or load-bearing changes
  • Stone benchtops (available as an add-on)
Get a fixed price for the Bathroom Renovation Full Renovation package

Premium

Stone, custom joinery, and the fittings you actually wanted.

$37k–$58k
Indicative — fixed after site visit

5–7 weeks on site

Included

  • Everything in Full Renovation
  • Custom-built joinery and stone benchtop
  • Large-format or feature tiling (allowance $120/m²)
  • Freestanding bath and premium tapware
  • Underfloor heating throughout
  • Concealed cisterns and wall-hung fixtures
  • Dedicated project manager and daily photo updates

Not included

  • Structural extensions
  • Relocating the bathroom entirely
Get a fixed price for the Bathroom Renovation Premium package

Common add-ons

Priced separately so you can see exactly what each one costs.

  • Underfloor heating +$2,200
  • Freestanding bath +$2,800
  • Stone benchtop +$1,900
  • Custom shower niche +$900
  • Skylight +$3,200 Tile roof

What actually drives the price

Bathroom quotes vary wildly because builders include wildly different things. Here is what moves your number, in the order it matters.

Whether fixtures move. Keeping the toilet, shower and vanity where they are is the single biggest saving available. Moving wet points means opening the floor, re-running drainage to fall, and re-waterproofing — around $4,500 on a standard job, more on a concrete slab.

What’s behind the tiles. Nobody knows until demolition day. Rotten studs, failed old waterproofing, or a floor that isn’t level all add cost. We price a contingency openly rather than discovering it later and issuing a variation you didn’t expect.

Tile choice and size. Large-format tiles cost more to lay, and mosaics cost far more again. Every package states a tile allowance per square metre. Pick something dearer and you pay the difference — not a re-quote of the whole job.

Waterproofing done properly. This is the part you never see and the only part that causes catastrophic failure. We waterproof to AS 3740, photograph every stage, and hand you the certificates. A bathroom that leaks into the subfloor two years on costs more than the renovation did.

How long you’ll be without a bathroom

A refresh is two to three weeks. A full renovation is three to five. Premium work with custom joinery runs five to seven, because stone and joinery have lead times that start the day you sign, not the day we demolish.

Those are working weeks on site, and they assume we’re not waiting on your selections. The single most common cause of delay is a tile or tapware decision that hasn’t been made. We lock selections before demolition for exactly this reason.

What you get that most quotes leave out

Site protection to your floors and hallway. Daily clean-down so you’re not living in dust. A named contact who answers the phone. Photo updates at every stage, including the parts that get covered up. Certificates for waterproofing, plumbing and electrical. And a defects walkthrough where we fix the small things before you pay the final invoice.

Questions

Bathroom Renovation FAQs

How much does a bathroom renovation cost in Melbourne?

Most full bathroom renovations in Melbourne land between $21,000 and $36,000 in 2026. A cosmetic refresh that keeps the existing layout runs $12,000–$18,000. Premium work with custom joinery, stone and underfloor heating sits between $37,000 and $58,000.

Our packages are published with those bands on the bathroom page, and the estimator will narrow the range for your specific bathroom in about a minute. The fixed price comes in writing after a free site visit.

What's the cheapest way to renovate a bathroom without cutting corners?

Keep the layout. Leaving the toilet, shower and vanity in their existing positions avoids opening the floor, re-running drainage to fall and re-waterproofing — that alone is around $4,500 on a standard bathroom, and more on a concrete slab.

After that: choose a standard-format tile rather than large-format or mosaic, keep tiling to shower height rather than full height on every wall, and pick quality mid-range tapware instead of designer brands. None of those decisions affect how long the bathroom lasts.

What we’d never suggest cutting: waterproofing, the substrate under the tiles, or licensed trades for plumbing and electrical. Those are the things that fail expensively.

How long will I be without a bathroom?

Two to three weeks for a refresh, three to five for a full renovation, five to seven for premium work with custom joinery or stone.

Those are working weeks on site and they assume your selections are locked before demolition. The most common cause of an overrun is a tile or tapware decision still being made while the trades wait — which is why we finalise every selection before the first day.

If it’s your only bathroom, we sequence the work to minimise the dead time and can usually keep the toilet operational for most of the job.

What waterproofing standard should a bathroom be done to?

AS 3740 — the Australian Standard for waterproofing domestic wet areas. It governs which surfaces must be waterproofed, how high the membrane goes in a shower, how junctions and penetrations are treated, and the curing time before tiling.

Waterproofing must be carried out by a licensed waterproofer, and you should receive a certificate. We photograph every stage of the membrane before it’s tiled over and hand you the documentation at completion.

This is the part of a bathroom you will never see and the only part whose failure is catastrophic. A leak into a subfloor discovered two years later costs more to rectify than the original renovation.

Do I need a building permit to renovate a bathroom in Victoria?

Usually not. A straightforward bathroom renovation that replaces fixtures and finishes within the existing room, without altering any structural element, generally does not require a building permit.

You do need one if the work involves structural change — removing or altering a load-bearing wall to enlarge the room, cutting new openings in structural walls, or altering the roof for a skylight in some circumstances.

Regardless of permits, the plumbing and electrical work must be done by appropriately licensed trades, and you should receive compliance certificates for both. That’s a legal requirement, not a nicety, and those certificates are what a buyer’s conveyancer will eventually ask for.

What does "tile allowance" mean in a quote?

It’s the per-square-metre budget the quote assumes for your tiles. Our Refresh package allows $45/m², Full Renovation allows $70/m², and Premium allows $120/m².

If you choose tiles that cost more, you pay the difference on the extra square metres — not a re-quote of the whole job. If you choose cheaper tiles, the difference comes back to you.

Allowances exist because tile prices range from $30/m² to well over $300/m², and no honest builder can quote a bathroom before you’ve chosen. Be wary of any quote that doesn’t state one: it either assumes the cheapest tile on the market, or it’s leaving room for a variation later.

What happens if you find rot or damage behind the walls?

We tell you the day we find it, with photos, a cost to rectify and options — before we do anything about it.

Old bathrooms hide failed waterproofing, rotted studs and bottom plates, corroded pipework, and floors that aren’t level. Nobody can see any of it until demolition day, so nobody can quote it beforehand honestly.

What we do is carry a stated contingency in the quote rather than pretending the risk doesn’t exist. If we don’t use it, you don’t pay it. What we won’t do is discover a problem, fix it silently, and present you with a variation at the end.

Is a small bathroom much cheaper to renovate?

Less than people expect. A compact bathroom saves on tiles and waterproofing area, which is why our estimator applies a 15% reduction — but the expensive parts barely scale.

You still need the same fixtures, the same licensed plumber and electrician, the same number of trade visits, and the same day-rate for each of them. A two-square-metre bathroom needs a toilet, a shower, a vanity and a functioning waste just as much as a six-square-metre one does.

Small bathrooms can occasionally cost more per square metre, because working in a tight space is slower and some fixtures need custom solutions to fit.

Is it cheaper to do the main bathroom and ensuite at the same time?

Yes, meaningfully — usually 15–25% less than doing them a year apart.

Trades mobilise once instead of twice. Materials come in one order. The waterproofer, tiler and plumber each do one continuous run of work rather than two separate call-outs with setup and pack-down on both. Site protection goes down once.

The obvious downside is having no bathroom at all for the duration. If that’s workable — you’re moving out, or there’s a third toilet — doing both together is one of the clearest savings available in a renovation.

Get your number

A minute of questions, then a real range for your project.

Start the estimator
Call Kusal Get my estimate