What actually drives the price
Bathroom quotes vary wildly because builders include wildly different things. Here is what moves your number, in the order it matters.
Whether fixtures move. Keeping the toilet, shower and vanity where they are is the single biggest saving available. Moving wet points means opening the floor, re-running drainage to fall, and re-waterproofing — around $4,500 on a standard job, more on a concrete slab.
What’s behind the tiles. Nobody knows until demolition day. Rotten studs, failed old waterproofing, or a floor that isn’t level all add cost. We price a contingency openly rather than discovering it later and issuing a variation you didn’t expect.
Tile choice and size. Large-format tiles cost more to lay, and mosaics cost far more again. Every package states a tile allowance per square metre. Pick something dearer and you pay the difference — not a re-quote of the whole job.
Waterproofing done properly. This is the part you never see and the only part that causes catastrophic failure. We waterproof to AS 3740, photograph every stage, and hand you the certificates. A bathroom that leaks into the subfloor two years on costs more than the renovation did.
How long you’ll be without a bathroom
A refresh is two to three weeks. A full renovation is three to five. Premium work with custom joinery runs five to seven, because stone and joinery have lead times that start the day you sign, not the day we demolish.
Those are working weeks on site, and they assume we’re not waiting on your selections. The single most common cause of delay is a tile or tapware decision that hasn’t been made. We lock selections before demolition for exactly this reason.
What you get that most quotes leave out
Site protection to your floors and hallway. Daily clean-down so you’re not living in dust. A named contact who answers the phone. Photo updates at every stage, including the parts that get covered up. Certificates for waterproofing, plumbing and electrical. And a defects walkthrough where we fix the small things before you pay the final invoice.